BRITISH MUSEUM

Location: Bloomsbury, London
Client: British Museum

Main Museum Gates

In 2016 the main museum electrical and control systems had been in-operational for some 8 years. IVERTECH were appointed to survey the control systems, propose a solution and implement. This work was carried out successfully during operational periods with no impact on museum activities.

Main LTHW Pumps

In 2016 The Museum existing LTHW pumps were nearing 40 years old. IVERTECH were appointed as a supply chain partner to survey, strip out, replace and commission the main pumps serving 2/3 of the Museum heating system. This work was carried out successfully during operational periods with no impact on Museum activities.